Very pleased with progress this week.  We needed to lay out the DPC  and set out the corners of the block work again on top the DPC to hold it in place.

2014-12-15 14.27.25

Once that was done the inner walls started going up very quickly and Barrie and I set out the window locations on the front and back walls.

2014-12-17 15.42.43

While Barrie continued with the side walls Jason and I tackled a few jobs that were due around the site like covering up the Gas meter and fixing the cracked drain cover.

2014-12-17 16.01.03

By the end of the week the side walls had been finished and the outside brick work has been started too.  We now have the measurements we need to order the roof trusses.

2014-12-19 11.48.50

Next week will probably be spent lifting the outside brick work to the same level as the blocks inside, oh and Enjoying Christmas too!  😉