Electrics

I decided pretty early on that I wanted to surface mount all the electrics for two reasons; firstly, I’m not 100% sure where I want the sockets yet and secondly after the aircraft is built I may want to reuse the building for something else and so it would be a waste fitting the electrics in the walls.

But before any electrical work can be started I need to get the fuse box (consumer unit) replaced in the main house as I think it’s older than I am!  All this has to go…

2015-04-13 07.33.24 2015-04-13 07.33.15

And be replaced with a single, shiny new system which has been fully tested and certificated by Fowler Electrical who were brilliant.

2015-04-13 17.33.58

Before the electricians can connect the workshop to the main house I need to install the conduit, wiring, lighting and sockets in the workshop…

2015-04-07 14.49.59 2015-04-07 14.50.04 2015-04-07 19.12.04 2015-04-11 17.59.57

That’s it for me, now I need the electricians to install the Workshop Consumer Unit and connect up to the incoming supply…

2015-04-14 17.37.42

We are ‘live’.  Sockets, lights and other bits all wired in.  Yay!